bridge element

英 [brɪdʒ ˈelɪmənt] 美 [brɪdʒ ˈelɪmənt]

【化】桥渡元素

化学



双语例句

  1. It was only later in the project that the correlation between the bridge role and the element in question was identified.
    稍后项目中的桥接角色和有问题的要素之间的相关性会被标识出来。
  2. In the section of the file, find the Bridge element with the id OmgCwmXmi, and change it as follows
    在文件的部分,找到id为OmgCwmXmi的Bridge元素,更改如下
  3. The cable band of a suspension bridge is a structural element connecting the main cable and suspenders.
    悬索桥缆索索箍是缆索与吊索的连接构件。
  4. A calculation model for the bridge using finite element method has been built, and the influence upon the temperature difference was analyzed.
    建立了该桥的有限元计算模型,并分析了温差的影响。
  5. Continuous box-girder bridge structure finite element model updating based on static-load testing
    基于静力荷载试验的连续箱梁桥结构有限元模型修正
  6. Static Analysis for Curved Extra-dosed Prestressing Continuous Rigid Frame Bridge Finite Element Analysis on CRCP Considering the Sub-grade Friction
    曲线部分斜拉&连续刚构桥力学行为研究连续配筋混凝土路面端部锚固的有限元分析
  7. Static Analysis of Main Bridge Superstructure of a Yellow River Bridge Based on Finite Element Method
    某黄河大桥主桥上部结构有限元静力分析
  8. Structure analysis of concrete cable-stayed bridge based on composite element
    基于组合单元的混凝土斜拉桥结构分析
  9. Modeling from a typical floating cable-stayed bridge, a whole bridge finite element model considering gravity and staved-cable force was analysed.
    此外,还建立了不考虑重力和斜拉索力的全桥模型和单塔模型用作比较。
  10. According to the structural properties and the vibration displacement of the box girder bridge, the element space damping matrix of the box girder bridge is derived on the principle of energy.
    根据箱梁桥的结构特点及振动过程中的位移,由能量原理演绎出箱梁桥空间振动的阻尼矩阵,给出了阻尼矩阵的显式表达式,可供工程实际应用。
  11. Improved Bridge Evaluation Through Finite Element Model Updating Using Static and Dynamic Measurements
    采用静态和动态法改进有限元模型进行桥梁评估
  12. Strength Analysis of T-type Beam Bridge by Finite Element Method
    T形梁桥有限元强度分析
  13. In this paper, the dynamic interactions among a moving train, its supporting railway track structure and bridge structure have been investigated by using vehicle track bridge element.
    提出了一个新的计算单元:车轨道桥单元,用有限元法分析列车、轨道、桥梁结构的动力相互作用。
  14. The Strength Analysis of SGB Car Bridge using Finite Element Method
    SGB后桥强度有限元分析
  15. Error analysis of saddle boundary condition of suspension bridge finite element model
    悬索桥模型鞍座边界条件的误差分析
  16. Research on Detailed Analysis of Slab Bridge with Finite Element Method
    板拉桥的详细有限元计算分析研究
  17. Processing of Fore and After Data of Bridge Finite Element Program by Using ActiveX Control
    运用ActiveX控件处理桥梁有限元程序前后数据
  18. Skew Bridge Finite Element Analysis Based on Skew Anisotropic Element
    基于斜交异性板单元的斜桥有限元分析
  19. Application of silicon bridge piezoresistive element in air pressure measurment
    桥式硅压阻器件在气压测量中的应用
  20. For assuring the alignment and internal force to meet the requirement of design, we calculate the construction structure of the bridge by finite element method, and analyzed the factors which influenced the alignment and internal force of the bridge to serve the decision of construction control.
    为保证桥梁成桥线形、内力满足设计要求,采用有限元法进行施工阶段结构计算,并对影响桥梁线形、内力状态的因素进行分析,为施工控制决策服务。
  21. Through perturbation theory, for the first four moment vibration, eigenvalue sensitivity analysis is performed for every element of a four span continuous beam bridge finite element model.
    运用摄动理论,对一四跨连续梁桥有限元模型,进行了各单元损伤时前四阶弯曲振动的特征值灵敏度分析。
  22. Damage Diagnosis Research of Continuous Beam Bridge Based on Element Modal Energy Ratio Method
    连续梁桥损伤诊断的单元模态能量比法研究
  23. This bridge apply finite element analysis software including Bridge Dr and Midas to establish the cable-stayed bridge computational model to simulate the actual loading, the force on the bridge structure, and deformation simulation analysis.
    本文以广东佛山高赞大桥为工程背景,应用有限元计算软件Midas和桥梁博士建立该斜拉桥的计算模型,模拟实际受荷,对桥梁结构的受力、变形进行仿真计算分析。
  24. At the same time, through calculation and analysis of the whole bridge structure finite element model, the dynamic response analysis of the main bridge in melting ice flood period in the big quality ice and mass flow melting ice respectively is carried out.
    同时,通过全桥结构有限元计算分析,分别对主桥在凌汛期大质量冰块和大规模的流凌作用下进行了动力响应分析计算。
  25. In this paper, utilize MIDAS CIVIL professional software to build a bridge structure finite element model of the bridge, and the actual construction process of the construction phase.
    本文采用Midascivil桥梁结构专业软件建立了该桥的有限元模型,并根据实际施工过程进行了施工阶段分析。
  26. Besides, when the number of the bridge element is too many, some special methods are presented, such as elements reduction methods and results visualization. 3.
    讨论了桥梁单元较多时的一些特殊处理方法(如单元缩减、结果可视化等)。
  27. The main content is as follows: ( 1) Taking the project as the background, has established the entire bridge spatial finite element model.
    本文的主要内容如下:(1)以工程为背景,建立了全桥空间有限元模型。
  28. According to the established bridge finite element model to do the analysis of the whole construction procedure, the results can provide theoretical basis for the development of the construction monitoring schemes and setting up the bridge arch measurements. 3.
    根据所建立的桥梁有限元计算模型对郑少高速公路航海路连接线南水北调大桥主线桥进行施工全过程仿真分析,所得结果为制定其施工监控方案和设置桥梁预拱度量值提供理论依据。
  29. The paper tries to simulate the working estate of steel-concrete composite beam in the extradosed cable-stayed bridge through finite element method and MIDAS software.
    本文力图通过有限元方法,利用MIDAS软件模拟组合梁在矮塔斜拉桥中的工作状态。
  30. The cable-stayed bridge finite element model updating technology is the basis of that work.
    其中,斜拉桥有限元模型修正技术是上述工作的基础。